Every build is unique.

Transmission Line - Campo Lindo, Chile

Date: August 2022

  • Project Overview: Helical Foundation Solutuons supplies (192) Helical Piles for a new transmission line with 220kv capacity in Campo Lindo, Chile.
  • Key Benefits:
    • Quick installation and accessible movement between work stations/tower site, which was a huge advantage to traditional concrete piles.
    • Easy quality control in the field via torque monitoring.
    • Easy adaptability to changes in the terrain due to permanent engineering support throughout the execution of the project.
    • Ability to work in poor quality soils where other types of foundations are not feasible options or are very expensive to implement.

Seamless Execution and Turn-Key Results

Have a Project in Mind?

Let’s Get Building!